Q1. [1]
Match Column I with Column II and choose the correct option :
Column I (Thermal Power Plant): a. Talcher, b. Ramagundam, c. Bhusawal, d. Vijayawada
Column II (State): i. Telangana, ii. Odisha, iii. Andhra Pradesh, iv. Maharashtra
- A a-ii, b-i, c-iv, d-iii
- B a-iii, b-iv, c-i, d-ii
- C a-iv, b-iii, c-ii, d-i
- D a-ii, b-i, c-iii, d-iv
Previously asked in CBSE board exam
2025 32/2/1 Q11
Generated by claude-sonnet-4-6 · 2026-06-15 07:02 · grounding rag
Model Answer
The correct answer is A: a-ii, b-i, c-iv, d-iii
Talcher – Odisha (ii), Ramagundam – Telangana (i), Bhusawal – Maharashtra (iv), Vijayawada – Andhra Pradesh (iii).
Explanation
These are standard thermal power plant locations from the NCERT map of India (Chapter 5 – Energy Resources). Students must memorise the state-wise locations of major thermal power plants shown in the textbook map. Ramagundam is in Telangana (formerly Andhra Pradesh), Talcher in Odisha, Bhusawal in Maharashtra, and Vijayawada in Andhra Pradesh.
If a question refers to an image, map, graph or diagram that is not shown here, open the Study Guide single page app, go to
Library and find the actual CBSE question paper. The original papers are also available on the CBSE website: